Mission Critical Architecture
Projects
P3 Cleanroom
The scope of work consisted of interior improvements for a modular cleanroom along with support equipment and tools interstitial space with an adjacent pump room exit concept and maximum allowable Haz. mat. quantities analysis for an H-5 acid exhaust scrubber with roof top HVAC unit selection, placement, and distribution with associated roof fortification electrical distribution and lighting.
  • Location: Phoenix, Arizona

  • Client: ASM

  • Size: 4,110 sf

  • Classification: 1,000 (ISO 3)


*Some project examples are based on past projects completed by our architecture team, outside of WMA Architects to demonstrate team experience and project credentials.

Our Experience Includes